Skip to content
UI/UX Atlas
Topics
Patterns
Color Tool
Templates
Quizzes
Topics
Patterns
Color Tool
Templates
Quizzes
Quizzes
/
Design Process
Agile UX Integration (sprint-ahead, MUXI) — Quiz
5 questions
·
Read the lesson first →
Question 1 of 5
Agile UX Integration (sprint-ahead, MUXI)
A product team runs a single two-week sprint where design, research, and engineering all share the same backlog. Designers are assigned 'UX stories' alongside developer stories. What is the fundamental problem with this structure?
UX stories cannot be estimated in story points, so velocity tracking breaks down
Design and engineering have incompatible phase relationships — discovery needs open-ended exploration time before stories are specified, while engineering needs fully specified work at sprint start; sharing one calendar creates a forced trade-off between research quality and delivery speed
The team should use Kanban instead of Scrum because sprints are too rigid for design work
There is no problem — collocating design and engineering stories on one board is modern best practice
Check answer